Distribution Center
o 81,000 SF distribution & shipping facility
o Completed in 1996
o $3,200,000 facility
o Program Includes:
- Distribution center for Medical Imaging
Equipment
- Direct connection to assembly production
areas
- Designed for future conversion into
engineering & office space
- Multi-level high lift racks utilized to
maximize efficiency of the floor plan
- Connection to existing headquarters
o Payto Architects Scope of services included:
- Master Plan Integration
- Project Design
- Construction Drawings
- Interior Design / Space Planning
- Contract Administration
The challenge for this project was to create not only a facility, which could accommodate the efficient flow of medical imaging equipment from production to delivery, but also a structure that could easily be converted into future engineering and office space. Through the use of a multi-level, high lift racking system, a relatively small floor plan was maximized to allow for a greater capacity of product warehousing and distribution. Loading docks on the south side of the building allow for immediate access to and from the adjacent highway.