|
|
|
|
|
|
|
INTERIORS AND BUILD-OUTS
- Lifeline Screening
- Marconi Medical Systems
- North Point
- University of Akron SAS Phase II
|
NORTH POINT TOWER: THE ATRIUM AND CONFERENCE CENTER 1001 Lakeside Avenue
Cleveland, Ohio |
|
|
Atrium and Conference Center
o Located on downtown Cleveland Lakefront
o Completed in 1988
o Program Includes:
- Dining seating for 250 people
- Converts to large gathering space for law
firm
- 94 seat conference center located off
lobby for building tenants
- Training room / Recording studio for mock
trials
o Payto Architects Scope of services included:
- Project Design
- Design Development
- Construction Drawings
- Contract Administration
The North Point Project takes it’s place at one of the most influential sites downtown Cleveland, which served as the gateway to the City and the lakefront development that followed: i.e. (Rock and Roll Hall of Fame, Great Lakes Science Center, Steamship Mather, RTA rail station, and the Stadium). The Atrium serves as both a break out space and Corporate Training facility for firm of Jones Day Reavis & Pogue, which is a majority tenant in the North Point complex. It can accommodate large group lectures and smaller discussion formats. A Training/Studio Room adjacent to the Atrium space is also integral to the attorneys of Jones Day in that it is used to conduct mock trials to give associates courtroom experience.
In addition, a 95-seat amphitheater on a mezzanine level can serve additional tenants in the North Point Tower building for group training needs.
Visit CORPORATE & WORKPLACE (exterior), EDUCATION & TRAINING, and PARKING STRUCTURES for more North Point Tower project discriptions. |
|